A Concrete Proposal
It was pouring cement rather than rain as the commissioning of our SG100 plant moves ever closer. Delivered in 11 trucks, over 70m3 of cement was poured into 4 concrete forms with timber shuttering to form reinforced bases for System 320, the SG100’s Active Carbon Bed odour control, and System 1000, its fresh water supply. More solid foundations for the commercialisation of our technology!
TRANSITION TO NET ZERO WITH OUR CARBON-REMOVING TECHNOLOGY
Carbon Negative Energy: Each year, a single SG100 plant can generate up to 40,000 MW hours of carbon-negative power, enough for around 10,000 homes, offices or commercial properties, as well as for the transportation sector and wider industry.
Carbon Reduction: It will remove up to 25,000 tonnes of CO2e – equivalent to the annual carbon emissions of 5,000 cars. With electrolysis, a plant processing biogenic waste will generate over 650 tonnes of green hydrogen. And the SG100 closes the waste management loop, offering a better low carbon alternative to landfill and incineration.
Carbon Capture: TheSG100 technology also generates ‘biochar’ and ‘carbon char’, a black, granular, dust-like co- product that can be sequestered in valuable agricultural, environmental, and industrial applications.